Building Contamination
Articles & Whitepapers
-
Project - Brussels Airport Company - Zaventem Expansion of the biological water treatment plant
Since 2010, Brussels Airport has its own on-site biological wasewater treatment plant with a processing capacity of 2.400 m³/d, which is designed, built and operated by Trevi nv. Two waste water flows are processed in this plant: sanitary waste water from terminal buildings, office buildings etc.; contaminated rainwater related to the de-icing of aircraft. A major increase in the number ...
-
Alberta Tier 1 Soil and Groundwater Remediation Guidelines
The Alberta Tier 1 Soil and Groundwater Remediation Guidelines are developed and updated by Alberta Environment and Parks through the legislative basis provided by the Water Act(Government of ...
News
-
How To Work On The Construction Site With Ease
How to organize a site in the most efficient and cost effective way? is the question many operators ask themselves before starting a job, or even buying new equipment. What are the most compatible machines? How can I cut costs? How can I easily ...
Equipment & Solutions
-
Showcase
Ion Exchange System
The ChromaPur system is our solution for removing contaminant build-up in chrome plating baths. The system works by passing the plating solution through a resin bed to remove dissolved contaminants, leaving behind purified and reusable chromic acid which is returned to the plating bath. This cycle dramatically reduces chemical and waste treatment costs while virtually eliminating downtime ...